TUFFGRIP CC COMMERCIAL

• Extended working time (up to 2 hours)
• Aggressive tack, fast-grab formula
• High-strength, water-resistant bond
• Ready for light traffic in 12 hours*
• LEED v4 contributing

The Product By The Numbers

RH

90%

PH NTR

5-9

MVER / EVE

8 POUNDS

OPEN TIME

15-60 MINUTES*

WORKING TIME

15-120 MINUTES*

CURE TIME

12 HOURS

LIGHT TRAFFIC

12 HOURS*

HEAVY TRAFFIC

24 HOURS*